top of page

Cross-Laminated Timber (CLT): 9 Myths and Facts About Mass Timber Buildings

Writer: Aya
Aya
11 minutes ago
10 min read
Sketch of a mass timber building under construction with a crane lifting a cross-laminated timber floor panel into place

Few structural materials have moved from niche product to skyline feature as quickly as cross-laminated timber. In just over a decade, the tallest timber residential building in the world went from a nine-story apartment block in London to a 25-story tower in Milwaukee, and the US building code was rewritten along the way.


That speed has left a trail of confusion. Some people still picture a timber high-rise as an oversized matchbox. Others treat mass timber as a guaranteed climate fix. Neither view matches the evidence. Below are nine common myths about CLT, each set against what fire tests, shake tables, building codes and finished buildings actually show.



Myth 1: Cross-Laminated Timber Is Just Thick Plywood

The comparison is understandable, since both products rely on layers laid crosswise. The difference lies in scale and raw material. Plywood is made from thin veneers peeled from logs. CLT is built from whole boards of sawn lumber, in North America usually dimension lumber such as 2x4s or 2x6s, stacked so that each layer runs at 90 degrees to the one below it and bonded with structural adhesive.


The North American product standard, ANSI/APA PRG 320, defines CLT as a prefabricated solid engineered wood product made of at least three orthogonally bonded layers of solid-sawn lumber or structural composite lumber. Panels are normally laid up symmetrically, so the two outer layers run in the same direction.


That alternating grain is what makes the product work. Ordinary wood is anisotropic: it is far stronger along the grain than across it, and it swells and shrinks much more across the grain. Crossing the layers gives a panel useful strength in two directions and makes it much more dimensionally stable, which is why the same product can serve as a floor slab, a load-bearing wall, a shear wall or a roof deck.


CLT is one member of a wider mass timber family, and the names are often mixed up:


  • Glued laminated timber (glulam): laminations glued with their grain all running the same way, used mainly for beams and columns.

  • Nail-laminated timber (NLT): boards set on edge and fastened together with nails, a technique with a long history in heavy timber buildings.

  • Dowel-laminated timber (DLT): boards joined with wooden dowels instead of glue or nails.

  • Cross-laminated timber (CLT): glued layers with alternating grain direction, made as large flat panels.


The product is also younger than many people assume. It was developed in Austria and Germany in the early 1990s. Engineer Gerhard Schickhofer presented his doctoral research on CLT in 1994 at Graz University of Technology, then worked with small Austrian sawmills to start production, and Austria issued the first national CLT guidelines in 2002.


Close-up sketch of a cross-laminated timber panel edge showing five layers of boards with alternating grain direction

Myth 2: A Wood Tower Will Burn Like a Campfire

Light timber framing and mass timber behave very differently in a fire. Thin studs and joists can burn through quickly. A thick timber panel does something more useful: its surface chars, and that char layer insulates the wood behind it and slows further burning.


The rate is steady enough to design with. The American Wood Council cites a char rate of roughly 0.64 mm (about 0.025 inches) per minute, and US design methods for CLT use a nominal char rate of 1.5 inches per hour. Engineers size members so that enough uncharred wood remains to carry the design load for the required rating period.


Testing supports this. A CLT wall tested to ASTM E119, a key step toward recognizing CLT in the 2015 International Building Code (IBC), was seeking a 2-hour rating and lasted 3 hours and 6 minutes. In 2017, the USDA Forest Products Laboratory, the American Wood Council and the ATF ran five full-scale fire scenarios in a two-story CLT apartment building at the ATF Fire Research Laboratory in Maryland. In two of the tests with exposed CLT, the fire decayed naturally, and in the test with automatic sprinklers, the sprinklers suppressed the fire.


None of this makes timber fireproof. Exposed wood is fuel, and it adds energy to a room fire. That is why codes limit how much mass timber may be left exposed in taller buildings and require sprinklers. Compartment fire tests carried out by RISE in Sweden in support of US code work also concluded that two exposed timber walls meeting in one corner should be avoided. A fair summary is that mass timber can be designed to meet the same fire-resistance ratings required of noncombustible construction, provided exposure, protection and connections are detailed with care.



Myth 3: Building Codes Stop Timber at Five or Six Stories

This was broadly true until recently. Under the 2018 and earlier editions of the IBC, mass timber projects were generally held to about five or six stories, depending on occupancy, unless the design team secured special approval.


The 2021 IBC changed that by adding three new construction types, developed by the International Code Council's Tall Wood Building Ad Hoc Committee. The former heavy timber type was renamed Type IV-HT, and the new types sit above it:


  • Type IV-A: up to 18 stories and 270 feet. All mass timber must be protected with noncombustible material such as gypsum board, and the primary structure of the tallest buildings needs a 3-hour fire-resistance rating.

  • Type IV-B: up to 12 stories and 180 feet, with limited areas of exposed mass timber and 2-hour fire-resistance ratings.

  • Type IV-C: up to nine stories in business occupancies (eight for multifamily residential) and 85 feet, with most interior mass timber allowed to stay exposed and a 2-hour rating for most structural elements.


Two cautions apply. These limits only matter where a state or city has adopted the 2021 or 2024 IBC, or the tall wood provisions on their own, and adoption varies widely. The rules are also still moving: the 2024 IBC increased the amount of timber that may be left exposed in Type IV-B buildings. The code edition actually in force locally is what counts for any real project.



Myth 4: The Tallest Timber Towers Are Made Entirely of Wood

Most record-setting timber buildings are hybrids. Concrete is still used where its mass, stiffness and noncombustibility are hardest to replace, particularly in foundations, podiums and the cores that hold stairs and elevators. A short timeline shows how the approach has developed:


  • Murray Grove (Stadthaus), London, 2009: designed by Waugh Thistleton Architects, this nine-story apartment building has eight stories of CLT structure above the ground floor, including the stair and lift cores. It was the tallest timber residential building in the world when completed.

  • Brock Commons Tallwood House, University of British Columbia, Vancouver, 2017: an 18-story student residence by Acton Ostry Architects, with a concrete podium and two concrete cores supporting 17 stories of CLT floors on glulam columns.

  • Mjøstårnet, Brumunddal, Norway, 2019: an 18-story mixed-use tower of about 85 meters (280 feet) that held the height record until 2022.

  • Ascent, Milwaukee, 2022: a 25-story, 284-foot apartment tower by Korb + Associates Architects. Its base, stair and elevator shafts are concrete, with six levels of parking at the bottom and 19 residential and amenity levels framed in CLT and glulam above. The Council on Tall Buildings and Urban Habitat certified it as the world's tallest timber-concrete hybrid building.


Calling these buildings hybrids is not a criticism. Using each material where it performs best is ordinary good engineering, and steel-framed towers routinely depend on concrete cores and foundations in the same way.


If you want to compare timber with another common framing system, our overview of steel structure in architecture and construction explains how steel frames are designed and built.



Myth 5: Timber Buildings Are Weak in Earthquakes

Weight works in timber's favor here. Earthquake forces on a building are inertial, so they grow with the building's mass, and a lighter structure attracts smaller seismic forces, all else being equal. Figures presented by WoodWorks put a 5-ply CLT floor panel, about 6 7/8 inches thick, at roughly 18 pounds per square foot, against about 80 pounds per square foot for a 6-inch concrete slab.


The strongest evidence so far came in 2023 from the NHERI TallWood project. Researchers built a full-scale, 10-story mass timber building, about 112 feet tall, on the outdoor shake table at the University of California San Diego, one of the two largest shake tables in the world. It was the tallest full-scale building ever tested on a shake table.


Its lateral system used post-tensioned mass timber rocking walls. Steel rods tensioned through the walls allow them to rock during shaking and then pull the building back to plumb. Over the test program the building was subjected to 88 ground motions, including simulations of magnitude 6.7 and 7.7 earthquakes, and it stayed upright throughout. The results support resilient, self-centering timber systems for high-seismic regions, although, as with any structure, real performance depends on how well the connections and lateral system are designed and built.


Myth 6: One Rainstorm on Site Will Ruin the Panels

WoodWorks makes the point bluntly: mass timber can, and usually will, get wet during construction. A short wetting is not a disaster. Most certified CLT and glulam is made with adhesives tested to resist moisture-related delamination, and wood that is wetted on the surface can dry again.


The real danger is moisture that cannot escape. Problems tend to appear when wet panels are covered by a concrete topping, an acoustic mat or a roofing membrane that blocks drying. A US Forest Service review found that the most challenging conditions for CLT assemblies came from heavy wetting during construction followed by an impermeable membrane. A moisture content of about 20 percent is commonly treated as the threshold for mold risk, so keeping timber below that level during construction is a sensible target.


Drying too fast can also cause damage. A sudden drop in moisture content, for example when heating and air conditioning start up after the building is enclosed, can open checks and cracks in exposed timber. Well-run projects plan moisture protection during design, well before the panels arrive. Typical measures include:


  • protecting panels during transport and storage on site;

  • using factory-applied sealers or temporary membranes on floor panels;

  • tenting or covering working floors in wet weather;

  • measuring moisture content before panels are covered with toppings, mats or membranes;

  • enclosing the building floor by floor as quickly as practical.



Myth 7: Every Mass Timber Building Is Carbon Negative

Wood does store carbon. Trees absorb carbon dioxide as they grow, and much of that carbon stays locked in the timber for as long as it remains in use. Waugh Thistleton, for example, estimates that the structural fabric of Murray Grove stores more than 180 tonnes of carbon, and that using timber instead of reinforced concrete kept a further 125 tonnes out of the atmosphere.


The mistake is treating that storage as an automatic win. Researchers, including those at the Carbon Leadership Forum, point to gaps in the way mass timber is usually assessed:


  • Forest management: typical life-cycle assessments do not record whether harvesting increases or reduces the carbon stored in a forest, and clear-cutting can release carbon held in forest soils.

  • Sourcing and transport: where the timber is grown, how it is processed and how far it travels all affect its embodied emissions.

  • End of life: so few mass timber buildings have been demolished that there is little real data on what happens to the wood afterwards.


A University of Washington study of end-of-life options found that reusing and recycling mass timber from demolished buildings gave the best net climate results, because the carbon stays stored for longer and new production is avoided. The practical lessons are to source timber from well-managed forests, design for disassembly and reuse, and judge projects on whole-building life-cycle results rather than a single headline figure.


Structure is only part of a building's climate impact. Our article on strategies for net-zero and carbon-neutral buildings looks at energy use and the other measures that matter.



Myth 8: A Timber Floor Is as Quiet as a Concrete Slab

Bare CLT is a weak acoustic barrier. Sound insulation depends heavily on mass, and wood is light. In the same WoodWorks comparison, the 6-inch concrete slab reached a Sound Transmission Class (STC) rating of 53, while the thicker 5-ply CLT panel reached only STC 41. WoodWorks notes that bare mass timber floor and wall assemblies are seldom used, largely for this reason.


The IBC requires assemblies separating dwelling units to reach STC and Impact Insulation Class (IIC) ratings of 50 in laboratory tests, or 45 when measured in the field. STC covers airborne sound such as voices and music, while IIC covers impact sound such as footsteps and dropped objects.


Acoustic designers improve timber floors in three ways: adding mass, adding barriers and decoupling layers. A common floor build-up, from top to bottom, looks like this:


  1. finish flooring, where used;

  2. a concrete or gypsum-based topping, usually 1 to 3 inches thick;

  3. an acoustic mat or underlayment that separates the topping from the structure;

  4. the CLT panel.


With a common 5-ply CLT panel, assemblies of this kind have reached STC ratings between 50 and 59. Teams that want to avoid wet toppings can use dry systems, such as wood sleepers with acoustic products or bonded layers of cement board, and WoodWorks publishes an inventory of acoustically tested mass timber assemblies for comparing options. Junctions need attention too, because sound can travel around a floor through connected walls, a problem known as flanking.


Cut-away sketch of a CLT floor assembly with acoustic mat, concrete topping and wood flooring above an exposed timber ceiling

Myth 9: Prefabrication Makes Every Project Faster

Speed on site is one of the clearest advantages of CLT. Panels arrive cut to size, often with window and door openings already formed. At Murray Grove, the openings were cut before delivery so panels could be craned straight into position, and the nine-story structure went up in about nine weeks. At Brock Commons, the timber structure was complete less than 70 days after the prefabricated components reached the site, roughly four months faster than a typical project of its size.


Lighter structures can also mean savings below ground, since the foundations needed to support them can be smaller.


The speed, however, is earned before construction starts. Because panels are manufactured to the drawings, decisions about openings, service penetrations, connections and panel layout have to be settled earlier than on a cast-in-place concrete job, and changes made on site are slower and costlier. Transport distance from the factory, crane access and the moisture plan all shape the schedule as well. Projects that get the most from CLT bring the manufacturer, engineers and contractor in early and coordinate the design in detail.


Much of that coordination now happens in shared 3D models, which our practical guide to building information modeling (BIM) explains step by step.


Weighing CLT on the Evidence

Cross-laminated timber is neither a novelty nor a cure-all. It is an engineered structural material with a substantial body of testing behind it, recognized in the IBC since 2015 and permitted up to 18 stories where the 2021 or later code applies. It can perform well in fire and earthquakes when designed correctly, and it can reduce a building's embodied carbon when the timber is responsibly sourced and the structure is planned for long life and eventual reuse.


Its limits are just as real. Floors need added layers to control sound, moisture has to be managed from the factory to the finished enclosure, and key design decisions must be made early. Projects that treat these as design tasks from day one, rather than problems to fix later, are the ones that show what the material can do.

Comments


bottom of page